Techniques Intelligent Construction Roof Using Concrete – Technology Building Roof Step By Step technology building

by AWEjjhgcdfghlkj



Mixers Construction – Construction – Mixers – Building – Music:

Images related to the topic technology building

Techniques Intelligent Construction Roof Using Concrete - Technology Building Roof Step By Step

Techniques Intelligent Construction Roof Using Concrete – Technology Building Roof Step By Step

Search related to the topic Techniques Intelligent Construction Roof Using Concrete – Technology Building Roof Step By Step

#Techniques #Intelligent #Construction #Roof #Concrete #Technology #Building #Roof #Step #Step
Techniques Intelligent Construction Roof Using Concrete – Technology Building Roof Step By Step
technology building
See all the latest ways to make money online: See more here
See all the latest ways to make money online: See more here

See also  LISTEN WITH HEADPHONES - Billie Eilish - 8D Audio Technology 8d technology

You may also like

20 comments

Zai Rimawia 28/09/2021 - 2:03 AM

Wrong slab

Reply
VOICE MIXER 28/09/2021 - 2:03 AM

They should need to put more water so it will compressed properly.

Reply
Buildings Methods 28/09/2021 - 2:03 AM

This roof will crack and leak. It uses 3/4" rock 4" deep, shrinkage will occur. Should have cast in 2 layers and thinner overall. My concrete roof did not leak in short rains but concrete is permeable and 3 week rains wept inside. I suggest this roof will have the same problem.
Solution, coat concrete with tar.

Reply
Xuân Thiện Nguyễn 28/09/2021 - 2:03 AM

This is viẹtnam, isnt it

Reply
Alberto Soto 28/09/2021 - 2:03 AM

Ese techo se va q colgar

Reply
wael albargouthi 28/09/2021 - 2:03 AM

To work a shearing old or/and new solid roof slab after putting & makes balance supporters & shuttering approval's , must do this thing's:
1. Make over labs steel with old slab not less 20cm space
2. Planted over labs by epoxy used on old slab
3. Must beams, ribbs and span's had more links L/3 every edge "M-"
4. Tie the L shape between slab, beams and parapets.
5. Put the slab steel V & H as same space on plane approval
6. Don't forget the Eelcto-mechanical works(if in founded)
7. Put the Cover block under steel slab and beams
8. Befor cast institute of slab must clean steel & slab land (air&water used)
9. The first on cast institute concrete of beams, ribbs & spans 1/3. Used the vibration machine at slab when casted concrete (by layers) to make the (Homogeneity in concrete)
10. Make surface smoothly after finished the cast institute concrete

Reply
جمال العبد 28/09/2021 - 2:03 AM

جيد جدا

Reply
Augus2 November 28/09/2021 - 2:03 AM

Wow! great job thanks for sharing this video god bless Philippines!

Reply
seven window 28/09/2021 - 2:03 AM

thanks a lot

Reply
ĐẠI THÀNH HUỲNH 28/09/2021 - 2:03 AM

good video

Reply
saddam Husen Hasensab 28/09/2021 - 2:03 AM

sopar

Reply
kajar kajar 28/09/2021 - 2:03 AM

Size of main rod and tie in mm?

Reply
Msstfd220 Nemaa 28/09/2021 - 2:03 AM

عمل جميل جميل

Reply
Jitendra Yadav 28/09/2021 - 2:03 AM

Very good ridig

Reply
Sheetal Prasad 28/09/2021 - 2:03 AM

छत 1 स्क्वायर फुट नाक का बताएं कितना गिट्टी और मोरम लगेगा

Reply
Anway Mandal 28/09/2021 - 2:03 AM

This rod formation, I think is wrong…in slab, at shorter span of bottom cage, main rod comes first then at longer span distribution bar…after that at top cage ,distribution bar is provider at longer span then main rod is provided on that!!

Reply
Sule Shangodoyin 28/09/2021 - 2:03 AM

Very good sight video view seen!
Sule Shangodoyin.

Reply
EST gamer 28/09/2021 - 2:03 AM

Nice video

Reply

Leave a Comment